Contact
Semiconductor & Advanced Fabrication

Semiconductor & Fab Workforce Intelligence

Skilled-trades and technical workforce intelligence for semiconductor fab construction and operations — so multi-billion-dollar onshoring investments are sited where the labor to build and run them actually exists.

Fab ConstructionSkilled TradesOnshoringSite Selection
Fab Construction & Operations ReadIllustrative
Sun Belt Region — Fab Site Candidate
Skilled trades availability (construction)
46%
Process technician availability (ops)
38%
Competing megaproject pressure
74%
Wage premium vs. national benchmark
29%
RecommendationMonitor
Coverage180+ U.S. markets
$100B+

Fab capital investment tracked across covered markets

2

Distinct workforces assessed per site — construction trades & operations technicians

180+

U.S. markets covered

<10 days

From shortlist to ranked site scorecards

The Workforce Reality

The onshoring wave rarely tests the workforce assumption underneath it.

The CHIPS-era onshoring wave has committed hundreds of billions to fab construction in markets that have never supported semiconductor manufacturing. The workforce assumption underneath these decisions is rarely tested: does the region have the skilled construction trades to build the fab on schedule, and the technicians to operate it at yield?

"A fab that can be built but not staffed is a capacity commitment that never materializes."

Both are scarce and both are contested. Fab construction demands electricians, pipefitters, instrumentation, and controls trades at a density most markets can’t supply — competing directly with data centers, EV plants, and infrastructure projects for the same pool. Operations require process technicians and equipment specialists that don’t exist locally and must be built through relocation, training pipelines, and multi-year ramps.

Intelligence Coverage

Two workforce phases, plus the competitive reality, assessed per candidate market.

01

Construction Workforce

Availability of the skilled trades required to build a fab — electrical, mechanical, instrumentation, controls, and specialty trades — sized against your construction timeline and the competing megaprojects absorbing the same trades in that market.

02

Operations Workforce

Supply of process technicians, equipment technicians, and technical operators — realistic local pool, the relocation and training gap, and the compensation required to attract and retain against national competition.

03

Compensation & Competition

What construction trades and fab technicians command in each market, the premium driven by concurrent megaproject demand, and who else is pulling from the same skilled workforce.

The Decisions We Support

Four questions before the site decision is locked.

1

Build on Schedule

Can this site be built on schedule given the trades available in the market?

2

Operate at Yield

Does the region have the technical workforce to operate at yield — or what’s the build-vs-relocate gap?

3

Lowest Risk Markets

Which candidate markets carry the lowest workforce execution risk?

4

Megaproject Pressure

Where are competing megaprojects going to constrain our trades and our technicians?

The Intelligence

Three solutions, applied to every candidate fab site.

Pre-Investment

Expansion Readiness™

Market-by-market feasibility read comparing construction and operations workforce across every candidate fab site.

Pre-Investment

Labor Availability Assessment™

Role-level assessment of skilled trades and technical workforce supply in your target market before the site commitment.

Risk Intelligence

Workforce Risk Monitoring™

Continuous monitoring of trades and technician availability across your site and competing megaprojects through the construction and ramp window.

Know whether your fab can be built and staffed — before the site decision is locked.